Watch
Quality low-emission gas power plants in the JIIPE Industrial Estate to provide sustainable electricity supply in support of industrial production and operations within the JIIPE Industrial Estate.
JIIPE Electricity Industrial Zone
STAGE 1 - 3 x 7.65 MW Dual Fuel Gas and MFO using the best technology from Wartsila, Finland
STAGE 2 - 500 MW using a gas turbine (operational in 2021)
STAGE 3 - 660 MW
JIIPE Industrial Zone Gas
STAGE 1 - Supply from the State Gas Company (since 2018)
STAGE 2 - LNG Terminal
East Java Industrial Estate JIIPE is the largest industrial estate in East Java as well as the first integrated industrial estate in Indonesia which has been equipped with ports and docks for yachts and housing with an environmentally friendly industrial area, named GEM City, with various exclusive facilities, such as golf courses and shopping centers within the industrial estate.
