kawasan industri gresik jiipe

Articles & News About the Industrial Zone JIIPE in Gresik

​JIIPE Industrial Park Power Plant

​JIIPE Industrial Park Power Plant

Quality low-emission gas power plants in the JIIPE Industrial Estate to provide sustainable electricity supply in support of industrial production and operations within the JIIPE Industrial Estate.

JIIPE Electricity Industrial Zone

STAGE 1 - 3 x 7.65 MW Dual Fuel Gas and MFO using the best technology from Wartsila, Finland

STAGE 2 - 500 MW using a gas turbine (operational in 2021)

STAGE 3 - 660 MW

JIIPE Industrial Zone Gas

STAGE 1 - Supply from the State Gas Company (since 2018)

STAGE 2 - LNG Terminal

East Java Industrial Estate JIIPE is the largest industrial estate in East Java as well as the first integrated industrial estate in Indonesia which has been equipped with ports and docks for yachts and housing with an environmentally friendly industrial area, named GEM City, with various exclusive facilities, such as golf courses and shopping centers within the industrial estate.


제련소를 넘어: 구리·금·은에서 새로운 가치를 창출하다

인도네시아는 수십 년 동안 구리 정광을 수출하며 부가가치 대부분을 해외에 내주었습니다. ê·...

태양광 소재에서 제조까지: JIIPE에서 키워가는 재생에너지 생태계

인도네시아의 태양광 잠재량은 약 3,294GW로 추정되지만, 2025년 말 기준 설치 용량은 약 1.49GW에 ë...


산업용지 취득 예약 / 제안 요청서

이 양식은 JIIPE SEZ 내에서 산업용지 취득에 진정으로 관심 있는 기업을 위한 것입니다. 당사의 요구사항을 평가하고 최적의 솔루션을 제공하기 위해 정확한 정보를 제공해 주시기 바랍니다.

All fields marked with an asterisk (*) are mandatory

기본 정보

JIIPE를 고려하는 이유 *
(Ha)

필요한 에너지 및 유틸리티
MW
m³/day
MMBTU/annum
Tons/Year